Monday, April 23, 2012

Porch Progress

It rained on Friday, so the siding crew moved under tarps and the porch roof to work on building a porch deck. Of course, it was raining so there aren't many pictures...

The workstation made with scaffolding and tarps.

Putting in the boards to hold everything up.


The boards were drilled into the strips of plastic in the ICF blocks.

They were also screwed or bolted (I didn't see) into the brick columns.

Friday, September 9, 2011

Pouring Concrete 9/1

WE DID IT! The last main pour of concrete was 9/1, so all our walls are now full of concrete! More updates to come!
The crew pouring concrete in the lounge wall.

More pouring concrete, this floor was probably the trickiest.

Filling in Jonathan's bedroom wall.

Concrete all the way to the brim!

Our lounge viewed from a place above the bathroom.

Thursday, August 11, 2011

First floor walls poured!

Tuesday was a big day here. After staying up til midnight and waking up before five, we got everything ready to pour the first floor walls at 8am.
The two Jeffs work on the porch ledger board.

That's right, construction HERE.

The set up for Tuesday involved concrete trucks and a big pumper truck that had a HUGE reach.

Moving steel for inside the walls.


Checking progress from the inside.

Concrete filling up under the windows.

Filling the walls.

More filling the walls.

Another view of the massive truck.

Wednesday, July 13, 2011

Catching up!

The new Hard Drive came for my computer so we're back in business with the blog! When I look at these pictures it seems like forever ago that the house looked like this. These are from almost two weeks ago!
Jeff pinning up the windows as we mock up the living room in the basement to check the window spacing.

Pouring concrete into the basement walls, it came via a conveyor belt then down the black tube.

The whole concrete operation. Two concrete trucks and one conveyor belt truck filled the street for the morning.

We currently have about 60 cubic yards of concrete in our house and still two more pours to go!

Another view of the conveyor belt through the front door.

Checking as the concrete rises in the basement.

What an ICF form looks like with concrete poured down it.

Aiming the concrete down into the walls was a tricky job.


Jeff screws down the bottom boards of the window bucks.

The front door with conveyor belt overhead.

Jonathan with his pet project, the garage floor. Every time we pour, the leftovers go into the garage to change the dirt floor to concrete. Jonny is where his next pour will go.

Monday, July 4, 2011

Basement walls and trusses

Still trying to catch up from a very busy week and a computer hard drive that was completely full. Here are some pictures from early last week of the basement walls and the truss system going in. These pictures are well behind what it looks like outside, so expect more soon.
The basement wall in the back. This is where the laundry room will be.

The laundry room from the other side.

The trusses for the first floor came on a big truck.
The crew installs the one huge beam that supports most of the first floor (no load bearing walls...)!

Getting ready for the rest of the trusses.

Jonny helps carry the trusses to the workers.

The family stands inside the back door, welcome to our first floor!

Saturday, July 2, 2011

Basement walls go up and up

Basement windows get framed out.

The basement walls of ICF block.



Baseball in the basement!

Tuesday, June 14, 2011

First ICF blocks!

Were you a kid who loved Legos and Duplex? If so, you should try building stuff with ICF. It will reignite that childhood passion of building with blocks! On Monday morning the first few rounds of ICF block went up in a couple of hours and then the guys started work to smooth out the floor for the basement.

Sarah removing stakes from the form-a-drain forms.

Jeff driving the high hoe, YIKES!

Jeff doing much safer work with a broom!

Jonny taking out stakes from the form-a-drain.

The crew build the basement walls, one 8 ft piece at a time!

The guys contemplate their next move.

The first two rows of ICF block all in place!